Handbag factory in Guangzhou, China
Baiyun District, Guangzhou, China. Cutting, sewing, packing, and shipment in genuine leather and PU leather.
Sampling 7–15 days. Bulk 25–45 days after the sample is locked. Genuine leather 30–50 pcs per style. PU leather 300–500 pcs per style.
01 Cutting
Pattern-locked cutting
Leather is cut to the pattern. Thickness, grain, and color are held to the sample.
02 Sewing
Sewing floor
Machine sewing and assembly follow the locked construction through bulk.
03 Packing
Warehouse and packing
Finished handbags are packed to the order: poly wrap, gift box, or carton. Goods are stored by program and shipped from Guangzhou.
At the factory

Cutting
Pattern board on the hide before cutting.

Sewing
Construction held through bulk.

Packing
Finished bags wrapped and stored by order.

Warehouse
Gift boxes, poly wrap, and carton packing.
How a program is made
01
Material inspection
Leather or PU, lining, and hardware checked against the locked spec.
02
Cutting
Pattern-locked cutting and component preparation.
03
Sewing
Machine sewing and required hand-finishing, held to the sample.
04
Assembly
Hardware, handles, straps, and closures set to the locked placement.
05
Finishing
Edge paint, cleaning, and inspection before the bag leaves the line.
06
Quality control
In-line checks and a final inspection before packing.
07
Packing
Poly wrap, gift box, or carton packing as specified for the order.
08
Shipment
Finished goods stored and shipped from Guangzhou.
Third-party inspection can be arranged against the locked sample.
Production capabilities
Materials
Genuine leather. PU leather.
Constructions
Tote, crossbody, shoulder, top-handle, structured, sets.
Services
OEM, ODM, private label, wholesale, e-commerce packing.
Floor
Pattern, cutting, sewing, assembly, finishing, inspection, packing, shipment.
Genuine leather existing styles typically 30–50 pcs per style. PU leather 300–500 pcs per style. Sampling typically 7–15 days. Bulk typically 25–45 days after the sample is locked. Typical ranges. Final MOQ and lead time depend on construction, materials, sample approval, and quantity.